Replace Roof Building 148 - Ft. Meade, SD

The project consisted of removing the old membrane roof, adding insulation fasteners, adding a 1/2in layer of dens deck glued to the insulation and installing new membrane roofing.  Also included was the removal and reinstallation of the perimeter trim metal.

IMG_2392.jpg
Steve Zander