Expand MRI Site Prep- Albuquerque, NM
The purpose of this project was to install patient lifts in order to assist healthcare workers and patients. Ceiling lifts, supports, and rails were procured and installed for the 15-bed building (2 bariatric, 13 regular, and 1 bathing suite). Additional rooms in the main hospital (Bldg. 41) and the Spinal Cord Injury Unit (Bldg. 45) required installation of purchased lifts to provide staff with the tools needed to assist hospital patients. Each room was returned to its original condition upon completion of the installation, to include patching and painting of walls and ceilings, fireproofing of structural steel, repair of lead lining, etc. as appropriate.