Upgrade Dental Finishes- Hot Springs, SD
This project involved; abating asbestos flooring in specific areas, removal and replacement of casework, patching and repairing walls. Existing paneling was removed and replaced with sheetrock. Additional work included painting, plumbing, and floor installation. Additional dental equipment and finishes were installed. This project was located at the VA Black Hills Health Care System Hot Springs Campus.